 Devon Energy, UT
 
Cerento designed and installed a turn-key self-supporitng 130' tower with a microwave backhaul link to an existing office and point-to-multipoint system for wellsite communications.

This project had (0) safety incidents and was completed on time and on budget.
 
 

 
 
Encana Site Decomission

Cerento Field Service personnel deomissioned an existing tower co-location to inlcude the antennas, transmission lines, mountinga hardware, equipment enclosure and foundation, grounding and utilities.

This project had (0) safety incidents and was completed on time and on budget.
 
 
 

 
 
 
 
BP Wamsutter, WY FAN Project

Cerento designed and installed a Field Area Network and Mobile solution in Wamsutter, WY in 2005. The installed RF network consists of the backbone infrastructure towers which provide access to wellsites and mobile communications to operator trucks and rigs.

This project had (0) safety incidents and was completed on time and on budget.
 
 

 
 
 
 
  
 
 
BP Trumbull County, OH RF Analysis

Cerento RF Engineers conducted an onsite RF spectrum analysis of the entire county. This results of the RF Spectrum analysis were then used to create RF Coverage Maps for both licensed and unlicensed frequency bands.

The RF Study will be used in developing new field communications using the best frequency for their application while using the least amount of infrastructure towers therefore reducing implementation costs.

This project was completed on time and on budget.
 

 
 
 
 
 
 
Merritt Energy Tower Inspections - EIA/TIA 222-G

Cerento Field Services conducts tower inspections for the Overthrust asset towers to ensure that all towers are within specifications. Thorough inspections are completed on the tower structure and all connectors are tightened to the manufacturer's specification. All mounting brackets and grounding connections are inspected for loose connections and damage. Corrective measures are taken in the event that corrsion or loose connections are discovered.

After the onsite inspection is completed a comprehensive report is created and filed. Cerento conducts inspections on these towers every 2 years.

The RF Engineering team also performance health checks on all of the microwave links to ensure that each link is running within the design threshhold. If performance issues are detected, corrective measures are applied. 
 

 
 
 
 
 
 
 

BP Durango, CO FAN Project

Cerento designed and installed a 3 Phase Field Area Network to support automation in this asset. This included design and installation of a high-speed RF Network Backbone with buildout of new tower sites. Cerento also installed a 900MHz frequency hopping system for wellsite communications and high-speed 2.4GHz coverage for the larger sites. The 2.4GHz system allowed for polling of site data, supporting of security cameras and internet access.

Cerento also designed and installed the power systems for each tower location which included backup power.

The Network Engineering team designed and configured a secure network link between the field and BP’s existing networks.


This project had (0) safety incidents and was completed on time and on budget.


 
  
 
 
 
Encana Tuscaloosa RF Analysis

Cerento RF Engineers conducted an onsite RF spectrum analysis in Louisiana and Mississippi. This results of the RF Spectrum analysis were then used to create RF Coverage Maps for both licensed and unlicensed frequency bands as well as licensed microwave backhaul links.

The RF Study was used as the basis of the Field Area Network that Cerento also designed. The goal was to provide communications to exisitng and future sites using the least amount of towers.

This project had (0) safety incidents and was completed on time and on budget.
 

 
  
 
 
 
BP Overthrust, WY FAN Project

Cerento designed and constructed an RF Network for communications. Part of this project involved decommissioning of old RF equipment and power systems. This network also involved specialized Network Engineering due to the required VLAN configurations for traffic separation.

This project had (0) safety incidents and was completed on time and on budget.


 

 
  
 
 
 
 
EOG Resources, WY & UT FAN Project

Cerento designed and installed a Field Area Network and Mobile solution in Big Piney, WY and Vernal, UT. The installed RF network consists of the backbone infrastructure towers which provide access for mobile communications to operator trucks.

Cerento is currently managing the network via a Maintenance and Operations Contract.

This project had (0) safety incidents and was completed on time and on budget.
 

 
  
 
 
 
 
Encana, WY FAN Project

Cerento designed and installed a Field Area Network and Mobile solution in the Wind River Basin, WY. The installed RF network consists of the backbone infrastructure towers which provide access to wellsites and mobile communications to operator trucks and rigs.

This project had (0) safety incidents and was completed on time and on budget.
 

 
 
 
 
 
 
 
BP Arkoma, OK Pilot Project

Cerento designed and installed an RF network that included new towers and wellsite towers that consisted of Canopy Radio and MDS radio Systems. This system supports drill rigs as well as automation trucks.

This project had (0) safety incidents and was completed on time and on budget.
 
 
 

 
 
 
 
 
 
Linn Energy, WY RF Analysis

Cerento RF Engineers conducted an onsite RF spectrum analysis to provide insight on an impaired microwave link. This results of the RF Spectrum analysis were then used to to isolate the frequency issue and aide in the design of a new microwave link that will be stable.

Cerento is currently working on the design and installation of a new link that will stabilize their operations.

This project had (0) safety incidents and was completed on time and on budget.
 

 
 
 
 
 
 
Devon Energy, WY

Cerento works with Devon Energy on network troubleshooitng, RF Analysis and troubleshooting, tower maintenance, tower construction and demolition, tower climbing and equipment installation/repair and security camera troubleshooting.

Cerento has the break/fix contract for the Western region with Devon Energy.


 

 
 
 
 
 
 
BP Moxa, WY FAN Project

Cerento designed Field Area Network and Mobile solution for the Moxa, WY asset. The designed network consisted of the backbone infrastructure towers, power and grounding systems and networking for mobile communications to operator trucks and rigs.

This project was completed on time and on budget.
 

 
 
 
 
 
 
Encana, WY CMT Project

Cerento designed and installed a CMT (Cerento Mobile Trailer) which is a self-contained communications and security trailer. The trailer consists of a solar power system, NEMA enclosure, wireless system, telescoping mast and outdoor security camera. The wireless system connects to the existing Field Area Network for access to the corporate office.

These trailers are deployed to construction sites, high-risk areas and security check-points.

This project had (0) safety incidents and was completed on time and on budget.
 
 

 
 
 
 
 
 
BP Jonah, WY FAN Project

Cerento designed and installed a Field Area Network using 3.65GHz Wi-Max in the Jonah, WY asset for mobile communications. This project included an RF Survey, Tower Structural Analysis as well as a tower replacement. Cerento worked very closely with the BLM in order to secure proper permitting for the new site construction.

In order to meet customer needs, Cerento created the MARS Trailer. The MARS Trailer is a mobile solution that ties into the main infrastructure and provides coverage in areas otherwise not covered. All custom truck communication installations are provided by Cerento.

This project had (0) safety incidents and was completed on time and on budget.
 

 
 
 
 
 
 
Encana, TX FAN Project

Cerento designed and installed a Field Area Network in the Fort Worth, TX region. The installed RF network consists of the backbone infrastructure towers which provide access to wellsites. The entire RF system utilizes licensed frequencies with all data transported to Encana servers.

This project had (0) safety incidents and was completed on time and on budget.
 

 
 
 

 

 